SlideShow

  • Fairfield Bridge
  • Fairfield Bridge
  • Fairfield Bridge Sign
  • Fence Along Roadway
  • Flower Pot Hanging From Pole
  • Fairfield Bridge
  • Fairfield Bridge
  • Fairfield Bridge
  • Completion of West Arch
  • Erection of East Fence and Arch Completed
  • The Decorative Arch Nears Completion
  • Work Continues on Fairfield Bridge
  • Now That Winter is Past, Work Continues
  • Progress to Date on Fairfield Bridge
  • The Outside Arch, Which Will Be More Visible From I-275, is Installed
  • First Sections of the Arch Are Installed
  • Day 5 Fence Erection
  • Day 3 of Fence Erection
  • Workers From Security Fence Begin Work on the Bridge's Architectural Details
  • Pavement Technologies Applies Reclamite
  • Landform Landscaping in New Traffic Islands
  • The Bridge Awaits Its New Fence and Steel Arch
  • Decorative Fence in Fabrication Shop
  • Decorative Metal Railing in Fabrication Shop
  • Painting of Bridge Complete
  • Paving almost complete
  • Final Paving Underway
  • Pavement Milling Completed, Fibermat Material Application in Underway
  • Bridge Painting Underway
  • East Side of the Bridge as Construction Crews Begin to Mobilize After Winter
  • March 14, 2013
  • City Seal and Name Are Now Visible From the Interstate
  • Stonework on the Bridge Facade
  • The Sidewalk Across the Bridge Cures in Its Forms
  • Architectural Stonework Installation Begins
  • All Lanes of Traffic Open
  • New Signals and All Lanes Open
  • Crews Install Street Name Signs on the New Mast Arms at Intersections Along South Gilmore
  • The View From the Recently Completed Bridge Deck - Walls Are Reinforced and Formed Awaiting Concrete
  • View of the Bridgework From I-275
  • The Bridge's Western Wingwall
  • A Wide Angle Facing North Displays the Progress of Work
  • Formwork and Reinforcing Steel for the New Bridge
  • Earthwork With the Bridge in the Background
  • Mast Arms and Signal Supports Are Erected for Future Traffic Control at Intersections
  • Workers Install Reinforcing Steel Before the New Bridge Deck is Poured
  • Work on the New Bridge
  • An Aerial View of the Project, Looking North Across I-275 Into Fairfield
  • Aerial View of Work on the Bridge and Interchange
  • Architectural Bridge Details Are Seen From the New Bridge Deck
  • Bridge Continues to Take Shape
  • Formwork for the Architectural Elements is Erected
  • Empty Space a New Lane Will Soon Occupy
  • The Bridge Marches Toward Completeness
  • Work on the Bridge is Visible From I-275
  • A Retaining Wall is Constructed to Fortify the Detention Basin and Allow the Road to Expand
  • Small Retaining Wall
  • Dense Web of Reinforcing Steel
  • Crews Perform Work on the New, Widened, Bridge Deck
  • New Retaining Wall
  • Intersection of South Gilmore and Kolb
  • Steel Structure Partially Installed
  • Earthwork at the Approach to the Bridge Over I-275
  • Earthwork is Performed
  • Work Continues on the Bridge Widening
  • Steel Foundation
  • Concrete Forms and Reinforcing Steel
  • Continuing Work on the Intersection
  • Boring Electrical Conduit
  • Crews Relocate a Fire Hydrant
  • Wide View of the Unaltered Bridge
  • Foundation Work for the Expansion of the Bridge
  • Workers Prepare the Subgrade
  • Crews Limited Traffic Lanes
  • Embankment Work for the Expanded Bridge
  • Workers Driving Piles for the Foundation of the Widened Bridge
  • Crews Working on the Westbound Exit Ramp
  • Aerial Image of I-275 and Winton/South Gilmore Road
  • Crews Work on the Water Line Under Interstate 275
  • Aerial Photograph Showing Clearing Around Bridge

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to South Gilmore / Winton / I-275 Improvement Project photos